Project: CH750-SR   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Skip Rhudy   -  
Project:   Zenair - CH 750   -   VIEW REPORTS
Total Hours:551
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 17, 2019 - No Finish Date
Engine:Corvair
Propeller:Sensenich W642KL-35GS
 
Friendly URL: https://eaabuilderslog.org?s=CH750-SR

Home or Last Project Picture

May 25, 2020     Horizontal Stabilizer - (2 hours)       Category: Empennage
More work on elevator, which is more delicate and complicated than I expected. Ordered a pneumatic angle drill because of tight quarters drilling so I can avoid drilling errors / damage to parts with drills that are too big. Ran into an issue with the CH750 prefab tip ribs not fitting correctly with the trim tab channel ends, which are slightly bent to accommodate fitting inside the tip rib flanges. Aligning the center of the trim tab channel flange properly with the third hole in the tip rib causes the tip rib flange to bulge considerably. So I have a technical question submitted to Zenith about it.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.